 2009 CONSTRUCTION SITE PHOTOS
September 23, 2009 - Interior of Central plant - Utility tunnel.
September 23, 2009 - Installation of pipe rack supports inside the Utility Tunnel
September 25, 2009 - Concrete footing pour at Central Plant.
September 25, 2009 - Concrete footing pour at Central Plant.
September 25, 2009 - Concrete footing pour at Central Plant.
September 25, 2009 - Concrete footing pour at Central Plant.
September 25, 2009 - Concrete footing pour at Central Plant.
September 25, 2009 - East end view of Central Plant's Utility Tunnel
September 25, 2009 - Concrete footing pour at Central Plant.
September 28, 2009 - New temporary exit from room 122 Medical/surgery building
September 29, 2009 - Reinforcing steel at pilaster column.
October 05, 2009 - Temporary handicap ramp and walkway at west end of Medical/Surgery Building.
October 05, 2009 - Backfill and compaction of Utility Tunnel.
October 8, 2009 - Underground electrical conduits at electrical room.
October 8, 2009 - Underground branch feeder conduits at electrical room.
October 9, 2009 - Underground conduits at boiler room.
October 9, 2009 - Moisture barrier installed beneath slab-on-grade.
October 13, 2009 - Rebar in slab-on-grade at emergency general room.
October 13, 2009 - Boiler room slab-on-grade.
October 13, 2009 - Slab-on-grade prep work.
October 14, 2009 - Demo of exiting handicap ramp at Medical/Surgery building.
October 14, 2009 - Boiler room slab-on-grade.
October 14, 2009 - Underground electrical rough-in at chiller room.
October 15, 2009 - Slab-on-grade concrete pour at generator room.
October 15, 2009 - Concrete slab-on-grade at electrical room.
October 15, 2009 - electrical and emergency generator concrete slab-on-grade pour.
October 15, 2009 - Finished concrete slab-on-grade at the emergency generator room.
 2010 CONSTRUCTION SITE PHOTOS
February 12, 2010
February 25, 2010
March 1, 2010
March 25, 2010
March 29, 2010
April 7, 2010
May 10, 2010
|